top of page
Search

M45A2 Bobbed 2.5 Ton 4x4- Shipped to Buckner, MO

  • Writer: dallasbepco
    dallasbepco
  • Dec 31, 2019
  • 1 min read

Bobbed 2.5 Ton M45A2 Shipped. Another awesome build. Appreciate our customers patience and communication through out this build. Our customers sometimes have to wait for the build to be completed based on demand of these trucks. They can take anywhere from 4-12 months from the time we talk to finished product. Truck options:

DOT Lighting Package, Rear Sliding Window installed in Fiberglass Top, 60 Amp Reducer, Rear Trailer Hitch w/ 7 Pin Hook-up, Locking Door Handles, Trailer Brake, Interior Floor Padding, 395/85R20 Michelin XZL Tires w/ Custom Wheels, 12.00R20 Tire w/ Stock Wheel Spare, and finished it off with the CARC Green Paint scheme.

Comments


Featured Posts
Archive
Follow Us
  • Instagram
  • Facebook Basic Square
  • YouTube
  • Twitter Basic Square
bottom of page